Skip to content

4.1 CKD Warehouse To Production-Line Move

Source Basis

This page is based on notes/odoo-assembly-workflow,md.

Purpose

Define the standard Odoo internal movement that takes one CKD package from warehouse stock to the assembly operation for one finished-goods build.

Standard Location Pattern

  • OVT/CKD Materials: CKD storage
  • OVT/Assembly: assembly line or production-line issue area

Workflow

  1. open the manufacturing order
  2. run availability and reservation for the required CKD package
  3. create or validate the internal move from OVT/CKD Materials to OVT/Assembly
  4. confirm the selected CKD package is no longer available in warehouse stock
  5. make the package available to the assembly operation

Expected Result

  • one CKD package is allocated to one MO
  • the package remains traceable by lot
  • warehouse stock is reduced by the issued package
  • assembly now holds the package that will be consumed in production

Control Rule

Use the stock move and location flow instead of manual inventory adjustment.