4.1 CKD Warehouse To Production-Line Move¶
Source Basis¶
This page is based on notes/odoo-assembly-workflow,md.
Purpose¶
Define the standard Odoo internal movement that takes one CKD package from warehouse stock to the assembly operation for one finished-goods build.
Standard Location Pattern¶
OVT/CKD Materials: CKD storageOVT/Assembly: assembly line or production-line issue area
Workflow¶
- open the manufacturing order
- run availability and reservation for the required CKD package
- create or validate the internal move from
OVT/CKD MaterialstoOVT/Assembly - confirm the selected CKD package is no longer available in warehouse stock
- make the package available to the assembly operation
Expected Result¶
- one CKD package is allocated to one MO
- the package remains traceable by lot
- warehouse stock is reduced by the issued package
- assembly now holds the package that will be consumed in production
Control Rule¶
Use the stock move and location flow instead of manual inventory adjustment.